Switzerland

M/V Africa Mercy

1999- in service

Acquired in 1999 through a donation from the Balcraig Foundation, the former Danish rail ferry ‘Droning Ingrid’ was re-named the Africa Mercy by Dame Norma Major in April 2000. The CHF70 million refit was funded by donations from the Oak Foundation, and continuing support from the Balcraig Foundation and other trusts, corporate gifts-in-kind, and individual contributors. The conversion was completed at A & P Shipyard, Newcastle-upon-Tyne, in March 2007 and was the largest conversion project of its kind in the UK. A comparable new vessel would cost more than double this price. With six operating theatres and a 78-bed ward, the Africa Mercy will ultimately double the annual medical capacity of her predecessors.

Hospital

The hospital covers most of the original rail deck – approximately 1,200 square meters. It is divided into quadrants containing supply/services, six operating theatres, recovery/intensive care and low-dependency wards with a total of 78 patient beds. Projected annual surgical capacity is approximately 7,000 operations onboard including cataract removal/lens implants, tumour removal, cleft lip and palate reconstruction, orthopaedics and obstetric fistula repair. The hospital contains a CT scanner as well as X-ray, laboratory services and a Nikon Coolscope, which allows remote diagnosis almost instantaneously. Whenever required, diagnoses are transmitted via an onboard satellite communication system to doctors in developed countries.

Programmes Ashore

In addition to the operations performed onboard, ship-based teams work in local villages providing a wide array of services to increase health and well-being which include dental clinics, medical clinics, community health education, HIV/AIDS intervention, water and sanitation projects including well drilling, construction, agriculture and micro-enterprise projects.

  

Specifications

Length 152m
Breadth 23.7m
Gross Tonnage 16572
Built 1980, Elsinore, Denmark
Registered Malta
Capacity 474 berths
Cargo 1724 m3
Main Engines4 B&W (3120 kW each)
Draft 6.0m
Surveyed ByBureau Veritas

Itinerary (Last updated in July 2010)

PortArrivalDeparture
Lome, Togo10 February 201016 August 2010
At sea16 August 201031 August 2010
Dry Dock, South Africa
(location to be confirmed)
1 September 2010?? January 2011
At sea?? January 201113 January 2011
Durban, South Africa
(Public Relations)
13 January 201118 January 2011
At sea18 January 201124 January 2011
Cape Town, South Africa
(Public Relations)
24 January 201130 January 2011
At sea30 January 201116 February 2011
Freetown, Sierra Leone16 February 20118 December 2011

VERY IMPORTANT NOTE: The above itinerary, as always, is TENTATIVE. Changes may occur. In addition, there are sometimes blackout dates when no new crew may arrive. It is therefore imperative to NOT make plans to arrive or depart the ship without first confirming directly with Mercy Ships.

click here if you'd like to subscribe to our Newsletter

The process of screening patients

Mercy Ships does not simply show up in a country and expect crowds to flock to its hospital ship in search of medical...

Volunteers needed!

Africa Mercy field service in Togo